Summary for Test 2025-03-25-27-7
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 994857 DEA: 010H6104 EFIS: 0117000241 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-13.5/R36.1 |
| Award Date | 10/31/2023 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AND OVERLAY HMA, & REPLACE GUARDRAILS. |
| Location Description | HUMBOLDT COUNTY AT AND NEAR BRIDGEVILLE FROM 3.4 MILES WEST OF GRIZZLY CREEK BRIDGE TO 0.8 MILE EAST OF SOUTH FORK VAN DUZEN RIVER |
| QA Service Level | 1 (Verified on 06/08/2023) |
Sample Information
| Sample Taken Date | 03/25/2025 | Sample Unique Key | 27 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/28/2025 |
| Sample type | Quality Assurance | A brief description of the sample | JMF 1 can PG 58-22 binder |
| The quantity of what the sample constitutes | 1 can binder | From where was the sample collected | Source |
| First name of sampler or witnessed by | Bryan | Last name of sampler or witnessed by | Sanderson |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 24-284 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Mercer Dinsmore Plant | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 907099 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Mercer Fraser Dinsmore | |
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-03-25-27
DIME Test ID: 2025-03-25-27-7
Testing Lab: WSP USA - Phoenix
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-04-15
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Brian Waterbury
Date of test: 04/11/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 189.633 grams
Mass of container #2 before test (m2i): 207.879 grams
Mass of container #1 after test (m1f): 189.435 grams
Mass of container #2 after test (m2f): 207.687 grams
Mass of empty container #1: 154.503 grams
Mass of empty container #2: 173.216 grams
Mass correction factor: 0.006
Average mass change: -0.553 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 4/15/2025 ✔
