Project Details
This page displays current information for project DEA: 010H6104.
Project Information
Project Identifiers | Project ID: 994857 DEA: 010H6104 EFIS: 0117000241 |
---|---|
DIST-CO-RTE-PM | 01-HUM-36-13.5/R36.1 |
Award Date | 10/31/2023 |
Closeout Date | Not set |
Work Description | COLD PLANE AND OVERLAY HMA, & REPLACE GUARDRAILS. |
Location Description | HUMBOLDT COUNTY AT AND NEAR BRIDGEVILLE FROM 3.4 MILES WEST OF GRIZZLY CREEK BRIDGE TO 0.8 MILE EAST OF SOUTH FORK VAN DUZEN RIVER |
QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joaquin.s.rodriguez@dot.ca.gov | Joaquin Rodriquez | Resident Engineer | Caltrans RE DB |
shantanu.nalawade@dot.ca.gov | Shantanu Nalawade | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 56 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-06-13-11 | 06/13/2025 | 06/13/2025 | Acceptance | Roadway/Bridge Surface | View |
2025-04-22-98 | 04/22/2025 | 05/19/2025 | Production Start-Up | Asphalt Rubber Binder | View |
2025-04-14-5 | 04/14/2025 | 04/14/2025 | Quality Assurance | Roadway/Bridge Surface | View |
2025-03-25-27 | 03/25/2025 | 03/28/2025 | Quality Assurance | Asphalt Binder | View |
2025-03-25-26 | 03/25/2025 | 03/28/2025 | Quality Assurance | Asphalt Binder | View |
2025-02-27-8 | 02/27/2025 | 02/28/2025 | Acceptance | Concrete | View |
2024-12-20-15 | 12/20/2024 | 12/25/2024 | Quality Assurance | Asphalt Binder | View |
2024-10-24-69 | 10/24/2024 | 11/08/2024 | Quality Assurance | Asphalt Binder | View |
2024-09-25-52 | 09/25/2024 | 09/27/2024 | Acceptance | Asphalt Rubber Binder | View |
2024-09-13-31 | 09/13/2024 | 09/16/2024 | Acceptance | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods