Summary for Test 2025-03-24-2-3
Test performed: ASTM C143-20Project Information
| Project Identifiers | Project ID: 994539 DEA: 021H58U4 EFIS: 0223000059 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-58.2/R78.4 |
| Award Date | 06/27/2023 |
| Closeout Date | Not set |
| Work Description | RECONSTRUCT ROADWAY, HMA PAVING, DRAINAGE AND ELECTRICAL WORK. |
| Location Description | PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE |
| QA Service Level | 1 (Verified on 05/08/2023) |
Sample Information
| Sample Taken Date | 03/24/2025 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/24/2025 |
| Sample type | Quality Control | A brief description of the sample | 9 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 8.5 cyds | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Donald | Last name of sampler or witnessed by | Juneman |
| Title of sampler | Quality Control Manager | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Precast Unlimited | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CT752SLA50 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 99855 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-03-24-2
DIME Test ID: 2025-03-24-2-3
Testing Lab: Precast Unlimited Inc.
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2025-03-24
Test Results
Input Type: Calculated
Tester's full name: Donald Juneman
Date of test: 03/24/2025
Slump: 5.25 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/24/2025 ✔
