Summary for Test 2024-10-28-77-2
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-26.3/27.6 |
| Award Date | 01/23/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY |
| Location Description | ON STATE ROUTE 99 |
| QA Service Level | 1 (Verified on 03/13/2023) |
Sample Information
| Sample Taken Date | 10/28/2024 | Sample Unique Key | 77 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/29/2024 |
| Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Julian | Last name of sampler or witnessed by | Carmona |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Mix 180412, Set 1 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | CalPortland | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
| Structure name | Abutment 1 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 180412 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 8 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | Abutment Wall 3 | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2024-10-28-77
DIME Test ID: 2024-10-28-77-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2025-03-21
Test Results
Input Type: Calculated
Tester's full name: Julian Carmona
Date of test: 10/28/2024
Unit weight of the concrete: 155.6 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/21/2025 ✔