Summary for Test 2024-05-31-65-2

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 994654
DEA: 07313504
EFIS: 0715000090
DIST-CO-RTE-PM07-LA,VEN-1-37.7/62.9,0.0/0.9
Award Date07/20/2023
Closeout DateNot set
Work DescriptionREMOVE AND CONSTRUCT BRIDGE AND CULVERTS.
Location DescriptionLOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date05/31/2024 Sample Unique Key65
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/01/2024
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes5 From where was the sample collectedJob Site
First name of sampler or witnessed byBertha Last name of sampler or witnessed byCampos
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identificationSL675350CE Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameAssociated Ready Mix Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure nameCT Pile #20, Security Paving Pile #8 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSL675350CE
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedCT Pile#18, Security Paving Pile #10 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2024-05-31-65
DIME Test ID: 2024-05-31-65-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-03-21

Test Results


Input Type: Calculated
Tester's full name: Bertha Campos
Date of test: 05/31/2024
Air Content: 1.3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/21/2025