Summary for Test 2025-01-15-11-5

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994310
DEA: 034F6504
EFIS: 0314000233
DIST-CO-RTE-PM03-YOL-50,80-0.0/2.5,4.1/R11.4
Award Date04/07/2023
Closeout DateNot set
Work DescriptionCRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIBER OPTIC CABLE SYSTEMS.
Location DescriptionYOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) AND ON ROUTE 50 FROM ROUTE 80 JUNCTION TO JEFFERSON BOULEVARD UNDERCROSSING
QA Service Level1 (Verified on 10/04/2022)

Sample Information

Sample Taken Date01/15/2025 Sample Unique Key11
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing01/15/2025
Sample typeQuality Assurance A brief description of the samplePolyester
The quantity of what the sample constitutesPolyester Concrete - 3 lanes From where was the sample collectedJob Site
First name of sampler or witnessed byPhillip Last name of sampler or witnessed byAsher
Title of samplerAssistant Structure Representative Telephone number of sampler916-768-8293
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameDBE Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier22-0104R
Structure nameRT 80/50 Separation Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedMoving Lane Closure DIST-CO-RTE03-YOL-80
Direction of TravelEast Post Mile9.86
Lanes to be TestedOn Ramp,Off Ramp Station

Test Details

DIME Sample ID: 2025-01-15-11
DIME Test ID: 2025-01-15-11-5
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-01-22

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 01/22/2025
Air Temperature: 59
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF BARRIER
Reference Distance 1: 30
Reference Distance 2: 33
Reference Distance 3: 36
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 15
Position for Stationing 2: 15
Position for Stationing 3: 15
Percent Grade for 1st Stationing: 2.0
Percent Grade for 2nd Stationing: 2.0
Percent Grade for 3rd Stationing: 2.0
Corrected Coefficients of Friction for Stationing 1: 0.42
Corrected Coefficients of Friction for Stationing 2: 0.42
Corrected Coefficients of Friction for Stationing 3: 0.42
Average Coefficient of Friction: 0.42
General comments (publicly viewable) (Max 1000 characters): REED AVE UC. BRIDGE ONLY

Test was verified on 1/22/2025