Summary for Test 2024-10-28-57-3
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 993118 DEA: 101C3304 EFIS: 1014000146 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-205-R4.6/R9.0 |
| Award Date | 04/05/2022 |
| Closeout Date | Not set |
| Work Description | Widening bridges, ramps and roadway. SR205 SMART CORRIDOR - PHASE 2 |
| Location Description | On state highway in San Joaquin County in and near Tracy from Janney Overhead to 1.3 miles east of MacArthur Drive Overcrossing. |
| QA Service Level | 1 (Verified on 07/06/2022) |
Sample Information
| Sample Taken Date | 10/28/2024 | Sample Unique Key | 57 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/28/2024 |
| Sample type | Quality Control | A brief description of the sample | Concrete |
| The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Hugo | Last name of sampler or witnessed by | Serrano |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Cemex | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1616182 |
|---|---|---|---|
| The truck number from where the sample was collected | 10069117 | The batch plant ticket number from where the sample was collected | 86858495 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Concrete truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-10-28-57
DIME Test ID: 2024-10-28-57-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-12-10
Test Results
Input Type: Calculated
Tester's full name: Hugo Serrano
Date of test: 10/28/2024
Temperature: 71 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/10/2024 ✔
