Summary for Test 2024-11-27-9-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 994654
DEA: 07313504
EFIS: 0715000090
DIST-CO-RTE-PM07-LA,VEN-1-37.7/62.9,0.0/0.9
Award Date07/20/2023
Closeout DateNot set
Work DescriptionREMOVE AND CONSTRUCT BRIDGE AND CULVERTS.
Location DescriptionLOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date11/27/2024 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/27/2024
Sample typeQuality Assurance A brief description of the sampleStructural Backfill
The quantity of what the sample constitutes120 SY From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byCarranza
Title of samplerMaterials Tester Telephone number of sampler213-238-4209
Laboratory sample identification24-3692 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameAbutment 2 Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleStructural backfill The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-11-27-9
DIME Test ID: 2024-11-27-9-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2024-12-06

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 11/27/2024
In-place wet density: 2.10
Highest adjust wet density: 2.17
% Moisture: 14.1 %
Optimum Moisture: 14.1 %
Relative compaction: 97
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/6/2024