Summary for Test 2024-10-14-60-1
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 214487 DEA: 120Q9304 EFIS: 1217000128 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-5,133,241-122,241-var |
| Award Date | 05/09/2022 |
| Closeout Date | 12/01/2025 |
| Work Description | 12-0Q930, SHOPP RESERVATION BRIDGE PROJECT - BRIDGE UPGRADE, WINGWALL, SUBSTRUCTURE, DECK, SPALL, JOINT SEAL, CONC. |
| Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 12/10/2020) |
Sample Information
| Sample Taken Date | 10/14/2024 | Sample Unique Key | 60 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/21/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 24-0433 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Associate Ready Mix - LF | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 556300 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 7301409 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Concrete from wheelbarrow | Where the material sample would have been placed if not sampled | El Toro Overhead |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-10-14-60
DIME Test ID: 2024-10-14-60-1
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2024-10-22
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: Dan Morris
Date of test: 10/22/2024
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 4.01 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.00 in
Maximum load on cylinder 1: 36490 lb
Maximum load on cylinder 2: 40990 lb
Maximum load on cylinder 3: 43940 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 8 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.63 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.57 in^2
Compressive strength of cylinder 1: 2889.2 psi
Compressive strength of cylinder 2: 3260.9 psi
Compressive strength of cylinder 3: 3495.6 psi
Compressive strength (to nearest 10 psi): 3220 psi
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 24-0433 | 138.07 KB | 10/22/2024 | 2024-10-14-60-1 | Info |
Test was verified on 10/22/2024 ✔
