Project Details
This page displays current information for project DEA: 120Q9304.
Project Information
Project Identifiers | Project ID: 214487 DEA: 120Q9304 EFIS: 1217000128 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5,133,241-122,241-var |
Award Date | 05/09/2022 |
Closeout Date | Not set |
Work Description | 12-0Q930, SHOPP RESERVATION BRIDGE PROJECT - BRIDGE UPGRADE, WINGWALL, SUBSTRUCTURE, DECK, SPALL, JOINT SEAL, CONC. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 12/10/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mario.leon@dot.ca.gov | Mario Leon | Resident Engineer | Caltrans RE DB |
josefino.g.valencia@dot.ca.gov | Josefino Valencia | Structural Representative | Caltrans SR DB |
keivan.hassan@dot.ca.gov | Keivan Hassan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-14-60 | 10/14/2024 | 10/21/2024 | Quality Assurance | Concrete | View |
2024-03-07-30 | 03/07/2024 | 03/08/2024 | Quality Assurance | Concrete | View |
2023-11-17-2 | 11/17/2023 | 12/01/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-11-17-1 | 11/17/2023 | 12/01/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-11-08-2 | 11/08/2023 | 11/13/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-09-15-71 | 09/15/2022 | 09/22/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2019-10-04-7 | 10/04/2019 | 10/04/2019 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods