Summary for Test 2024-09-27-37-2
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 1000101 DEA: 081J2904 EFIS: 0818000015 |
---|---|
DIST-CO-RTE-PM | 08-RIV-215-25.0/R31.2 |
Award Date | 06/18/2024 |
Closeout Date | Not set |
Work Description | RHMA, HMA, REPLACE AC SURFACING, AND COLD PLANE AC PVMT. |
Location Description | RIVERSIDE COUNTY IN AND NEAR PERRIS FROM 0.1 MILE SOUTH OF SAN JACINTO RIVER BRIDGE TO 0.3 MILE NORTH OF RAMONA EXPRESSWAY |
QA Service Level | 1 (Verified on 05/15/2024) |
Sample Information
Sample Taken Date | 09/27/2024 | Sample Unique Key | 37 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/30/2024 |
Sample type | Verification | A brief description of the sample | JMF Verification |
The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
First name of sampler or witnessed by | Maryanna | Last name of sampler or witnessed by | Maryanna Landaverde |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Martin Marietta (CCA) Lake Elsinore | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | Lot number | ||
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Valero Marketing & Supply - Wilmington CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2024-09-27-37
DIME Test ID: 2024-09-27-37-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2024-10-03
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 10/03/2024
Any material loss from containers during heating process/testing?: no data
Mass of empty container #1: 170.763 grams
Mass of empty container #2: 172.236 grams
Mass of container #1 before test (m1i): 205.917 grams
Mass of container #2 before test (m2i): 207.268 grams
Mass of container #1 after test (m1f): 205.767 grams
Mass of container #2 after test (m2f): 207.119 grams
Average mass change: -0.426 percent
General comments (publicly viewable) (Max 1000 characters): -0.426 + 0.006 = -0.420
Test was verified on 10/3/2024 ✔