Project Details
This page displays current information for project DEA: 081J2904.
Project Information
Project Identifiers | Project ID: 1000101 DEA: 081J2904 EFIS: 0818000015 |
---|---|
DIST-CO-RTE-PM | 08-RIV-215-25.0/R31.2 |
Award Date | 06/18/2024 |
Closeout Date | Not set |
Work Description | RHMA, HMA, REPLACE AC SURFACING, AND COLD PLANE AC PVMT. |
Location Description | RIVERSIDE COUNTY IN AND NEAR PERRIS FROM 0.1 MILE SOUTH OF SAN JACINTO RIVER BRIDGE TO 0.3 MILE NORTH OF RAMONA EXPRESSWAY |
QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rodolfo.c.cao@dot.ca.gov | Rodolfo Cao | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 21 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-11-12-50 | 11/12/2024 | 11/13/2024 | Acceptance | Aggregate | View |
2024-11-06-92 | 11/06/2024 | 11/13/2024 | Acceptance | Aggregate | View |
2024-11-05-82 | 11/05/2024 | 11/06/2024 | Acceptance | Aggregate | View |
2024-11-04-85 | 11/04/2024 | 11/01/2024 | Acceptance | Soil | View |
2024-11-01-75 | 11/01/2024 | 11/01/2024 | Acceptance | Soil | View |
2024-10-29-89 | 10/29/2024 | 10/29/2024 | Acceptance | Soil | View |
2024-10-29-88 | 10/29/2024 | 10/29/2024 | Acceptance | Soil | View |
2024-10-29-87 | 10/29/2024 | 10/29/2024 | Acceptance | Soil | View |
2024-11-12-38 | 11/12/2024 | 11/13/2024 | Verification | Asphalt Binder | View |
2024-11-06-69 | 11/06/2024 | 11/13/2024 | Verification | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods