Summary for Test 2024-06-28-5-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994412 DEA: 06442564 EFIS: 0620000053 COOP: 061774 |
|---|---|
| DIST-CO-RTE-PM | 06-KER,-46-26.1/30.2 |
| Award Date | 07/17/2023 |
| Closeout Date | 05/09/2025 |
| Work Description | CONVERT 2-LANE CONVENTIONAL HIGHWAY TO A 4-LANE EXPRESSWAY. |
| Location Description | KERN COUNTY IN AND NEAR LOST HILLS FROM 1.3 MILES WEST OF BROWN MATERIAL ROAD TO 0.2 MILE EAST OF CALIFORNIA AQUEDUCT |
| QA Service Level | 1 (Verified on 08/21/2023) |
Sample Information
| Sample Taken Date | 06/28/2024 | Sample Unique Key | 5 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/28/2024 | Sample type | Acceptance |
| A brief description of the sample | 3/4 Type A HMA | The quantity of what the sample constitutes | L1SL110 |
| From where was the sample collected | Source | First name of sampler or witnessed by | Paul |
| Last name of sampler or witnessed by | Klinker | Title of sampler | Plant Inspector |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Granite Solari | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 110 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-06-28-5
DIME Test ID: 2024-06-28-5-2
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-06-28
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Mike Cozad
Date of test: 06/28/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 3946.9 g
Mass of the specimen and specimen basket assembly prior to ignition: 6004.2 g
Mass of HMA Sample prior to ignition: 2057.3 g
Mass Loss: 102.4 g
Mass of aggregate remaining after ignition: 1954.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.56 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 4.42 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-442564_37037_240628_L1SL110_T209_HMA | 39.54 KB | 06/28/2024 | 2024-06-28-5-2 | Info |
Test was verified on 6/28/2024 ✔
