Project Details
This page displays current information for project DEA: 06442564.
Project Information
Project Identifiers | Project ID: 994412 DEA: 06442564 EFIS: 0620000053 COOP: 061774 |
---|---|
DIST-CO-RTE-PM | 06-KER-46-26.1/30.2 |
Award Date | 07/17/2023 |
Closeout Date | Not set |
Work Description | CONVERT 2-LANE CONVENTIONAL HIGHWAY TO A 4-LANE EXPRESSWAY. |
Location Description | KERN COUNTY IN AND NEAR LOST HILLS FROM 1.3 MILES WEST OF BROWN MATERIAL ROAD TO 0.2 MILE EAST OF CALIFORNIA AQUEDUCT |
QA Service Level | 1 (Verified on 08/21/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jake.garcia@dot.ca.gov | JAKE GARCIA | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-29-9 | 09/29/2023 | 09/29/2023 | Acceptance | Soil | View |
2023-09-28-9 | 09/28/2023 | 09/28/2023 | Acceptance | Soil | View |
2023-09-28-10 | 09/28/2023 | 09/28/2023 | Acceptance | Soil | View |
2023-09-27-8 | 09/27/2023 | 09/27/2023 | Acceptance | Soil | View |
2023-09-27-9 | 09/27/2023 | 09/27/2023 | Acceptance | Soil | View |
2023-09-27-10 | 09/27/2023 | 09/27/2023 | Acceptance | Soil | View |
2023-09-27-11 | 09/27/2023 | 09/27/2023 | Acceptance | Soil | View |
2023-09-22-6 | 09/22/2023 | 09/22/2023 | Acceptance | Hot Mix Asphalt | View |
2023-09-22-7 | 09/22/2023 | 09/22/2023 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods