Summary for Test 2024-06-19-108-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 994820
DEA: 060V1104
EFIS: 0616000208
DIST-CO-RTE-PM06-FRE,KIN-5,41,198-Var
Award Date08/31/2023
Closeout Date05/09/2025
Work DescriptionSTRATFORD KINGS RIVER BRIDGE REPLACEMENT.
Location DescriptionFRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 09/20/2023)

Sample Information

Sample Taken Date06/19/2024 Sample Unique Key108
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/19/2024
Sample typeAcceptance A brief description of the sampleRecycled Class 2 AB
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byjohn Last name of sampler or witnessed bybaker
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMCM Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Jobsite material
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSB 41 JNO Bridge
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-06-19-108
DIME Test ID: 2024-06-19-108-2
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-06-27

Test Results


Number of tests: 1
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 06/26/2024
Temperature correction: 0
Temperature of solution: 75
Clay reading (test 1): 8
Sand reading (test 1): 3.9
Sand equivalent (test 1): 49
Sand equivalent before temperature correction: 49
Sand equivalent after temperature correction: 49
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/27/2024