Project Details

This page displays current information for project DEA: 060V1104.

Project Information

Project IdentifiersProject ID: 994820
DEA: 060V1104
EFIS: 0616000208
DIST-CO-RTE-PM06-FRE,KIN-5,41,198-Var
Award Date08/31/2023
Closeout DateNot set
Work DescriptionSTRATFORD KINGS RIVER BRIDGE REPLACEMENT.
Location DescriptionFRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 09/20/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
din.dadawalla@dot.ca.govDin DadawallaResident EngineerCaltrans RE DB
martin.j.garcia@dot.ca.govMartin GarciaStructural RepresentativeCaltrans SR DB
justin.palmaymesa@dot.ca.govJustin PalmaymesaMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 170 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-07-25-1307/25/202407/25/2024Quality AssuranceRoadway/Bridge SurfaceView
2024-07-19-2007/19/202407/19/2024Quality AssuranceRoadway/Bridge SurfaceView
2024-07-16-5007/16/202407/17/2024Quality AssuranceConcreteView
2024-07-12-4807/12/202407/15/2024Quality AssuranceConcreteView
2024-07-10-4507/10/202407/10/2024AcceptanceSoilView
2024-07-10-4407/10/202406/10/2024AcceptanceSoilView
2024-07-10-4207/10/202407/11/2024AcceptanceHot Mix AsphaltView
2024-07-10-2507/10/202407/11/2024AcceptanceAggregateView
2024-07-11-1407/11/202407/11/2024Quality AssuranceHot Mix AsphaltView
2024-07-11-1307/11/202407/11/2024AcceptanceAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods