Summary for Test 2024-05-03-4-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
| Award Date | 06/06/2018 |
| Closeout Date | Not set |
| Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
| Location Description | LA/SBD County Line to PM 13.2 near I-15 |
| QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
| Sample Taken Date | 05/03/2024 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/10/2024 |
| Sample type | Per Request | A brief description of the sample | #11 Zap Screwlok Type 2 |
| The quantity of what the sample constitutes | 28 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Robert | Last name of sampler or witnessed by | Mendoza |
| Title of sampler | Inspector | Telephone number of sampler | (951) 264-7798 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC Rebar | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | CIDH OS304-3 | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
| Coupler Manufacturer | Dayton Superior CMC Rebar | Intermediate Assembler or Fabricator | |
| Rebar Size | #11 | Coupler Model | Zap Screwlok Type 2 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 4000016131 and 4000017377 | Rebar Heat Number(s) | 9001721 |
| Rebar Size 2 | 11 | Coupler Unique ID | SL-17-03 |
Test Details
DIME Sample ID: 2024-05-03-4
DIME Test ID: 2024-05-03-4-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2024-05-13
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: aauvinen
Date of test: 05/13/2024
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | No. 11/36mm | 1 | 0 | 1.56 | 125217 | 80267 | Service Splice | aauvinen |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 5/13/2024 ✔
