Summary for Test 2024-04-12-27-4
Test performed: CTM TEMP1-16Project Information
Project Identifiers | Project ID: 994820 DEA: 060V1104 EFIS: 0616000208 |
---|---|
DIST-CO-RTE-PM | 06-FRE,KIN-5,41,198-Var |
Award Date | 08/31/2023 |
Closeout Date | Not set |
Work Description | STRATFORD KINGS RIVER BRIDGE REPLACEMENT. |
Location Description | FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 09/20/2023) |
Sample Information
Sample Taken Date | 04/12/2024 | Sample Unique Key | 27 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/12/2024 |
Sample type | Quality Control | A brief description of the sample | 1 cubic ft. of Concrete taken from middle of batching |
The quantity of what the sample constitutes | 1 cubic ft. of Concrete for Testing | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Patrick | Last name of sampler or witnessed by | Wright |
Title of sampler | Lab Technician | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | ConFab Lathrop | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | K80CP1L |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 2901 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Bed 1A, 4th Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-04-12-27
DIME Test ID: 2024-04-12-27-4
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2024-04-15
Test Results
Input Type: Calculated
Tester's full name: Mark Patrick Baddu
Date of test: 04/12/2024
Precast Maximum Curing Temperature: 130.5 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/15/2024 ✔