Summary for Test 2023-12-21-18-8
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993781 DEA: 07322404 EFIS: 0716000055 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-134-R12.6,R12.9 |
| Award Date | 08/03/2022 |
| Closeout Date | 03/13/2025 |
| Work Description | REMOVE BRIDGE RAILING AND PLACE CONCRETE BARRIER. |
| Location Description | LOS ANGELES COUNTY IN PASADENA AT ARROYO SECO BRIDGE AND AT THE ORANGE GROVE BOULEVARD ON-RAMP OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 12/21/2023 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/05/2024 |
| Sample type | Quality Assurance | A brief description of the sample | #5 DBL Barrel Zap Screwlok |
| The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Pedro | Last name of sampler or witnessed by | Labrada |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | BarSplice CMC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #5 | Coupler Model | DBL BRL Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 30802 | Rebar Heat Number(s) | 4132739 |
| Rebar Size 2 | Coupler Unique ID | SB-17-02 |
Test Details
DIME Sample ID: 2023-12-21-18
DIME Test ID: 2023-12-21-18-8
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2024-01-05
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: aauvinen
Date of test: 01/05/2024
UTM: 400KIP
Temperature: 72.00 f
Halo ID: NA
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 8 | 0 | 5 | 13 | 0 | 0.31 | 29269 | 94418 | Service Splice | aauvinen |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 1/5/2024 ✔
