Project Identifiers | Project ID: 993781 DEA: 07322404 EFIS: 0716000055 |
---|---|
DIST-CO-RTE-PM | 07-LA-134-R12.6,R12.9 |
Award Date | 08/03/2022 |
Closeout Date | Not set |
Work Description | REMOVE BRIDGE RAILING AND PLACE CONCRETE BARRIER. |
Location Description | LOS ANGELES COUNTY IN PASADENA AT ARROYO SECO BRIDGE AND AT THE ORANGE GROVE BOULEVARD ON-RAMP OVERCROSSING |
QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Sam.Toutounchian@dot.ca.gov | Sam Toutounchian | Resident Engineer | Caltrans RE DB |
Ryan.Vantine@syrusaengineering.com | Ryan Vantine | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 22 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-11-16-22 | 11/16/2024 | 11/18/2024 | Acceptance | Hot Mix Asphalt | View |
2024-11-16-7 | 11/16/2024 | 11/18/2024 | Verification | Asphalt Binder | View |
2024-11-16-6 | 11/16/2024 | 11/18/2024 | Production Start-Up | Aggregate | View |
2024-11-16-1 | 11/16/2024 | 11/18/2024 | Production Start-Up | Hot Mix Asphalt | View |
2024-07-12-93 | 07/12/2024 | 07/12/2024 | Quality Assurance | Aggregate | View |
2024-02-03-1 | 02/03/2024 | 02/08/2024 | Department Acceptance | Aggregate | View |
2023-12-14-48 | 12/14/2023 | 12/21/2023 | Department Acceptance | Concrete | View |
2023-12-05-58 | 12/05/2023 | 12/12/2023 | Department Acceptance | Aggregate | View |
2023-12-21-18 | 12/21/2023 | 01/05/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
2023-12-14-36 | 12/14/2023 | 12/15/2023 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods