Summary for Test 2023-08-07-92-5
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 215157 DEA: 021H5704 EFIS: 0216000036 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-299-67.8/77.8 |
| Award Date | 02/09/2023 |
| Closeout Date | 06/11/2024 |
| Work Description | BURNEY CAPM - PAVEMENT REHABILITATION |
| Location Description | BUNCH GRASS LOOKOUT RD TO NAPA LN |
| QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
| Sample Taken Date | 08/07/2023 | Sample Unique Key | 92 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/07/2023 |
| Sample type | Production Start-Up | A brief description of the sample | Lime Treated 3/4-inch Type A HMA (eq. PG 64-28 M) with 23.6% RAP and virgin PG 58-34 M binder from Valero (Benicia, CA) |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Cindy | Last name of sampler or witnessed by | Bryant |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | D79308 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | J.F. Shea Construction — Fawndale Rock and Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 857938 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | JMF2210P04 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-08-07-92
DIME Test ID: 2023-08-07-92-5
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-12-28
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Measured
Tester's full name: Josh Murphy
Date of test: 08/10/2023
| 1 | 2 | 3 | ||||
|---|---|---|---|---|---|---|
| 2.395 | 2.402 | 2.421 | ||||
| 2.585 | ||||||
7.4 % | 7.1 % | 6.3 % | ||||
6.9 % | ||||||
General comments (publicly viewable) (Max 1000 characters): AASHTO T 269:
Pa=6.9%;
MS-2:
VMA=16.7%,
VFA=58.4%,
DP=1.1
Test was verified on 12/28/2023 ✔