Summary for Test 2023-11-29-31-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
---|---|
DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Cholame Segment |
Location Description | Not set |
QA Service Level | 1 (Verified on 09/30/2019) |
Sample Information
Sample Taken Date | 11/29/2023 | Sample Unique Key | 31 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/29/2023 |
Sample type | Department Acceptance | A brief description of the sample | Towed Trailer |
The quantity of what the sample constitutes | Skid Testing | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jessie | Last name of sampler or witnessed by | Wilson |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Job Site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Highway 46 Mainline WB |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | CRCP (Continuously Reinforced Concrete Pavement) |
---|---|---|---|
Type of Traffic Control Provided | N/A | DIST-CO-RTE | 05-SLO-46 |
Direction of Travel | Post Mile | ||
Lanes to be Tested | Lane #1 | Station |
Test Details
DIME Sample ID: 2023-11-29-31
DIME Test ID: 2023-11-29-31-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-12-14
Test Results
Pavement or Bridge Deck?: Pavement
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 11/29/2023
Air Temperature: 57 F
Tire Pressure: 25 psi
Equipment PST #: 7010835
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Stationing
Edge used to measure position: Left of the right lane line
Project Stationing 1: 1328+40 ft
Project Stationing 2: 1328+65 ft
Project Stationing 3: 1328+90 ft
Project Stationing 4: 1329+15 ft
Project Stationing 5: 1329+40 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Direction and Lane # for Stationing 4: no data
Direction and Lane # for Stationing 5: no data
Position for Stationing 1: 8 ft
Position for Stationing 2: 8 ft
Position for Stationing 3: 8 ft
Position for Stationing 4: 8 ft
Position for Stationing 5: 8 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Percent Grade for 4th Stationing: 0.0 %
Percent Grade for 5th Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.26
Corrected Coefficients of Friction for Stationing 2: 0.26
Corrected Coefficients of Friction for Stationing 3: 0.26
Corrected Coefficients of Friction for Stationing 4: 0.26
Corrected Coefficients of Friction for Stationing 5: 0.26
Average Coefficient of Friction: 0.26
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/14/2023 ✔