Summary for Test 2023-09-29-52-1

Test performed: ASTM C1064-17
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 994116
DEA: 010J4104
EFIS: 0119000025
DIST-CO-RTE-PM01-HUM-299-30.7/33.4
Award Date11/23/2022
Closeout DateNot set
Work DescriptionProject Name: HUM-299 Curve Improvement
Location DescriptionHUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.1 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE
QA Service Level1 (Verified on 07/29/2022)

Sample Information

Sample Taken Date09/29/2023 Sample Unique Key52
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/30/2023
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes60 cy From where was the sample collectedJob Site
First name of sampler or witnessed byDave Last name of sampler or witnessed byGonzales
Title of samplerspecial inspector Telephone number of sampler707-599-5169
Laboratory sample identificationC8937 Linked DIME Sample ID
The fabricator/manufacturer/facility nameEureka Ready mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameHwy 299 Soldier Pile Wall Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberE675WRF
The truck number from where the sample was collected282 The batch plant ticket number from where the sample was collected32477
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete sample from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-09-29-52
DIME Test ID: 2023-09-29-52-1
Testing Lab: SHN Engineers & Geologists, Incorporated
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2023-11-08

Test Results


Input Type: Calculated
Tester's full name: Dave Gonzales
Date of test: 09/29/2023
Temperature: 68 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/8/2023

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.