Project Details
This page displays current information for project DEA: 010J4104.
Project Information
Project Identifiers | Project ID: 994116 DEA: 010J4104 EFIS: 0119000025 |
---|---|
DIST-CO-RTE-PM | 01-HUM-299-30.7/33.4 |
Award Date | 11/23/2022 |
Closeout Date | Not set |
Work Description | Project Name: HUM-299 Curve Improvement |
Location Description | HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.1 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE |
QA Service Level | 1 (Verified on 07/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ethan.retherford@dot.ca.gov | Ethan Retherford | Resident Engineer | Caltrans RE DB |
laura.cangas@dot.ca.gov | Laura Cangas | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 234 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-03-22-63 | 03/22/2024 | 03/22/2024 | Quality Control | Concrete | View |
2024-07-08-57 | 07/08/2024 | 07/08/2024 | Quality Control | Aggregate | View |
2024-07-08-56 | 07/08/2024 | 07/08/2024 | Quality Control | Aggregate | View |
2024-07-02-81 | 07/02/2024 | 07/02/2024 | Quality Control | Concrete | View |
2024-07-08-55 | 07/08/2024 | 07/08/2024 | Quality Control | Aggregate | View |
2024-07-15-7 | 07/15/2024 | 07/15/2024 | Quality Control | Concrete | View |
2024-07-02-47 | 07/02/2024 | 07/02/2024 | Quality Control | Aggregate | View |
2024-07-02-46 | 07/02/2024 | 07/02/2024 | Quality Control | Aggregate | View |
2024-07-02-45 | 07/02/2024 | 07/02/2024 | Quality Control | Aggregate | View |
2024-07-01-4 | 07/01/2024 | 07/01/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods