Summary for Test 2023-09-22-43-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
| Award Date | 11/12/2020 |
| Closeout Date | 06/02/2025 |
| Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
| QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
| Sample Taken Date | 09/22/2023 | Sample Unique Key | 43 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2023 |
| Sample type | Production Start-Up | A brief description of the sample | PG Asphalt Binder |
| The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Nathan O QC | Last name of sampler or witnessed by | Nathan O QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0493-23 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | MM - Lake Elsinore | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-09-22-43
DIME Test ID: 2023-09-22-43-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-10-16
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 10/03/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 170.719 grams
Mass of empty container #2: 172.892 grams
Mass of container #1 before test (m1i): 205.631 grams
Mass of container #2 before test (m2i): 207.934 grams
Mass of container #1 after test (m1f): 205.641 grams
Mass of container #2 after test (m2f): 207.944 grams
Average mass change: 0.029 percent
General comments (publicly viewable) (Max 1000 characters): 0.029 + 0.006 = 0.035
Test was verified on 10/16/2023 ✔
