Project Details
This page displays current information for project DEA: 081C8504.
Project Information
Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
---|---|
DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
QA Service Level | 1 (Verified on 02/24/2021) |
Samples
Samples submitted for this project.
Displaying 1-10 of 176 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-18-22 | 11/18/2022 | 11/21/2022 | Acceptance | Hot Mix Asphalt | View |
2022-11-18-42 | 11/18/2022 | 11/21/2022 | Acceptance | Asphalt Binder | View |
2022-11-18-49 | 11/18/2022 | 11/21/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-11-17-8 | 11/17/2022 | 11/18/2022 | Verification | Aggregate | View |
2022-11-17-18 | 11/17/2022 | 11/18/2022 | Per Request | Asphalt Binder | View |
2022-11-05-1 | 11/05/2022 | 11/05/2022 | Quality Assurance | Soil | View |
2022-11-05-2 | 11/05/2022 | 11/05/2022 | Quality Assurance | Soil | View |
2022-11-03-35 | 11/03/2022 | 11/03/2022 | Quality Assurance | Soil | View |
2022-11-03-36 | 11/03/2022 | 11/03/2022 | Quality Assurance | Soil | View |
2022-11-01-45 | 11/01/2022 | 11/01/2022 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods