Summary for Test 2023-09-23-13-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993773 DEA: 021H5004 EFIS: 0216000045 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-3,299-VAR |
| Award Date | 11/14/2022 |
| Closeout Date | 06/19/2025 |
| Work Description | STRUCT CONC BRIDGE, POLYESTER CONC OVERLAY & ROCK SLOPE PROTECTION. |
| Location Description | TRINITY COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 04/25/2022) |
Sample Information
| Sample Taken Date | 09/23/2023 | Sample Unique Key | 13 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2023 |
| Sample type | Production Start-Up | A brief description of the sample | 1 bag of Combined RAP |
| The quantity of what the sample constitutes | Production Start Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Brandon | Last name of sampler or witnessed by | White |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D79357B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Tullis - Northstate Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 857918 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Northstate Asphalt |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2023-09-23-13
DIME Test ID: 2023-09-23-13-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-10-03
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Terry McCormick
Date of test: 09/26/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3108.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4896.5 g
Mass of HMA Sample prior to ignition: 1788.0 g
Mass Loss: 115.9 g
Mass of aggregate remaining after ignition: 1672.1 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.17 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.31 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.32
Test was verified on 10/3/2023 ✔
