Project Details
This page displays current information for project DEA: 021H5004.
Project Information
Project Identifiers | Project ID: 993773 DEA: 021H5004 EFIS: 0216000045 |
---|---|
DIST-CO-RTE-PM | 02-TRI-3,299-VAR |
Award Date | 11/14/2022 |
Closeout Date | Not set |
Work Description | STRUCT CONC BRIDGE, POLYESTER CONC OVERLAY & ROCK SLOPE PROTECTION. |
Location Description | TRINITY COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 04/25/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mandhir.grewal@dot.ca.gov | Mandhir Grewal | Resident Engineer | Caltrans RE DB |
mike.sears@dot.ca.gov | Mike Sears | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-05-56 | 10/05/2023 | 10/25/2023 | Department Acceptance | Asphalt Binder | View |
2023-09-27-30 | 09/27/2023 | 09/27/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-09-23-5 | 09/23/2023 | 09/25/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-09-23-7 | 09/23/2023 | 09/25/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-09-23-8 | 09/23/2023 | 09/25/2023 | Production Start-Up | Aggregate | View |
2023-09-23-9 | 09/23/2023 | 09/25/2023 | Production Start-Up | Reclaimed Asphalt Pavement | View |
2023-09-23-10 | 09/23/2023 | 09/25/2023 | Production Start-Up | Aggregate | View |
2023-09-23-12 | 09/23/2023 | 09/25/2023 | Production Start-Up | Aggregate | View |
2023-09-23-13 | 09/23/2023 | 09/25/2023 | Production Start-Up | Reclaimed Asphalt Pavement | View |
2023-09-23-14 | 09/23/2023 | 09/25/2023 | Production Start-Up | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods