Summary for Test 2023-09-22-35-1

Test performed: ASTM D217-16

Project Information

Project IdentifiersProject ID: 215109
DEA: 081C8504
EFIS: 0813000047
DIST-CO-RTE-PM08-RIV-74-0.0/5.8
Award Date11/12/2020
Closeout Date06/02/2025
Work DescriptionROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS.
Location DescriptionRIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET
QA Service Level1 (Verified on 02/24/2021)

Sample Information

Sample Taken Date09/22/2023 Sample Unique Key35
Date that the sample was received by the laboratory/organization performing the testing09/25/2023 Sample typeProduction Start-Up
A brief description of the sampleAsphalt Rubber Binder The quantity of what the sample constitutes1 Quart Can
From where was the sample collectedSupplier First name of sampler or witnessed byNathan O QC
Last name of sampler or witnessed byNathan O QC Title of sampler
Telephone number of sampler Laboratory sample identification0493-23
Linked DIME Sample ID The fabricator/manufacturer/facility nameMM - Lake Elsinore
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number
Sublot number Asphalt Rubber Binder Mix Number

Test Details

DIME Sample ID: 2023-09-22-35
DIME Test ID: 2023-09-22-35-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2023-09-27

Test Results


Determination: Unworked Penetration
Input Type: Calculated
Tester's full name: Sm Ali
Date of test: 09/27/2023
Unworked Penetration: 35 0.1 mm
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/27/2023 ✔