Summary for Test 2023-08-21-31-1
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 214998 DEA: 044H0504 EFIS: 0413000080 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-12-25.8-33.3 |
| Award Date | 07/29/2022 |
| Closeout Date | Not set |
| Work Description | BRIDGE SCOUR MITIGATION |
| Location Description | SONOMA COUNTY NEAR SANTA ROSA AT SONOMA CREEK BRIDGE AND AT HOOKER CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/10/2020) |
Sample Information
| Sample Taken Date | 08/21/2023 | Sample Unique Key | 31 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/22/2023 |
| Sample type | Quality Control | A brief description of the sample | a total of 6 cylinders of 4x8 size |
| The quantity of what the sample constitutes | 18 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Sayed | Last name of sampler or witnessed by | Banouri |
| Title of sampler | Inspector | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Shamrock Materials Inc | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 20-0305 | |
| Structure name | 20-0305 Sonoma Bridge | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | D67112P1 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 138 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | On the hopper | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-08-21-31
DIME Test ID: 2023-08-21-31-1
Testing Lab: Ghilotti Construction Company
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-01-03
Test Results
Input Type: Calculated
Tester's full name: Sayed Banouri
Date of test: 08/21/2023
Temperature: 80 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/3/2024 ✔
