Sample Record
Owner Labs
- Sierra Geotech DBE Inc.
- Ghilotti Construction Company
DIME Sample ID 2023-08-21-31
Project Information
Project Identifiers | Project ID: 214998 DEA: 044H0504 EFIS: 0413000080 |
---|---|
DIST-CO-RTE-PM | 04-SON-12-25.8-33.3 |
Award Date | 07/29/2022 |
Closeout Date | Not set |
Work Description | BRIDGE SCOUR MITIGATION |
Location Description | SONOMA COUNTY NEAR SANTA ROSA AT SONOMA CREEK BRIDGE AND AT HOOKER CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/10/2020) |
Sample Information
Sample Taken Date | 08/21/2023 | Sample Unique Key | 31 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/22/2023 |
Sample type | Quality Control | A brief description of the sample | a total of 6 cylinders of 4x8 size |
The quantity of what the sample constitutes | 18 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Sayed | Last name of sampler or witnessed by | Banouri |
Title of sampler | Inspector | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Shamrock Materials Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 20-0305 | |
Structure name | 20-0305 Sonoma Bridge |
Material Information
Material Type | Concrete | The concrete mix design number | D67112P1 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 138 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | On the hopper | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2023-08-21-31-1 | CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete | Sayed Banouri, Ghilotti Construction Company | 08/21/2023 | Nishit Prajapati | Yes | 01/03/2024 | ||
2023-08-21-31-2 | ASTM C143-10a: Standard Test Method for Slump of Hydraulic-Cement Concrete | Sayed Banouri, Ghilotti Construction Company | 08/21/2023 | Nishit Prajapati | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-08-21-31-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2023-08-21-31-2 ASTM C143-10a