Summary for Test 2023-08-09-35-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date08/09/2023 Sample Unique Key35
Date that the sample was received by the laboratory/organization performing the testing08/09/2023 Sample typeQuality Assurance
A brief description of the sampleSOIL The quantity of what the sample constitutes1140SQF
From where was the sample collectedJob Site First name of sampler or witnessed bytony
Last name of sampler or witnessed byprice Title of samplerTET
Telephone number of sampler Laboratory sample identification08092023TEST 01
Linked DIME Sample ID The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedAT THE JOBSITE
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2023-08-09-35
DIME Test ID: 2023-08-09-35-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-08-11

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: tony price
Date of test: 08/09/2023
Gage No.: 33197
Test No.: 1
Nuclear By: TONY PRICE
Non-Bias Plan No.: 6
Depth: 8
Material No.: AGGREGATE BASE
Material Type: SUBGRADE
Impact By: TONY PRICE
Standard Count Density: 1848
Count or Density 1: 1026
Count or Density 2: 992
Count or Density 3: 1069
Standard Count Moisture: 587
Moisture Count 1: 98
Moisture Count 2: 96
Moisture Count 3: 95
Sum of Count or Density: 3087
Average of Count or Density: 1029
Sum of Moisture Count: 289
Average of Moisture Count: 96
Count Ratio Density: 0.56
Count Ratio Moisture: 0.16
Calculated Percent Relative Compaction: 97.2 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/11/2023 ✔