Summary for Test 2023-06-06-46-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993669 DEA: 112N1164 EFIS: 1121000145 |
|---|---|
| DIST-CO-RTE-PM | 11-IMP-186-0.0/2.1 |
| Award Date | 06/09/2022 |
| Closeout Date | 12/01/2023 |
| Work Description | COLD PLANE, SAMI, RHMA-G AND PAVEMENT MARKINGS |
| Location Description | IMPERIAL COUNTY AT ANDRADE FROM MEXICO BORDER TO ROUTE 186/8 SEPARATION |
| QA Service Level | 1 (Verified on 03/29/2022) |
Sample Information
| Sample Taken Date | 06/06/2023 | Sample Unique Key | 46 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/09/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2" RHMA-G |
| The quantity of what the sample constitutes | 8 boxes 8 bags | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Enrique | Last name of sampler or witnessed by | Martinez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 7402-PSU | Linked DIME Sample ID | 2023-06-05-40 |
| The fabricator/manufacturer/facility name | API Gateway | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 1 |
| Sublot number | 3 | HMA Mix Number | 1 |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-06-06-46
DIME Test ID: 2023-06-06-46-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-08-04
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Melchor Oronoz
Date of test: 06/20/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3881.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 5417.4 g
Mass of HMA Sample prior to ignition: 1536.4 g
Mass Loss: 117.2 g
Mass of aggregate remaining after ignition: 1419.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.06 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 7.57 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/4/2023 ✔
