Project Details
This page displays current information for project DEA: 112N1164.
Project Information
Project Identifiers | Project ID: 993669 DEA: 112N1164 EFIS: 1121000145 |
---|---|
DIST-CO-RTE-PM | 11-IMP-186-0.0/2.1 |
Award Date | 06/09/2022 |
Closeout Date | 12/01/2023 |
Work Description | COLD PLANE, SAMI, RHMA-G AND PAVEMENT MARKINGS |
Location Description | IMPERIAL COUNTY AT ANDRADE FROM MEXICO BORDER TO ROUTE 186/8 SEPARATION |
QA Service Level | 1 (Verified on 03/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
daniel.hernandez.duarte@dot.ca.gov | Daniel Hernandez Duarte | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-11-73 | 10/11/2022 | 09/15/2022 | Verification | Hot Mix Asphalt | View |
2022-09-15-97 | 09/15/2022 | 09/15/2022 | Verification | Hot Mix Asphalt | View |
2023-06-08-68 | 06/08/2023 | 06/09/2023 | Quality Assurance | Aggregate | View |
2023-06-08-67 | 06/08/2023 | 06/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-07-83 | 06/07/2023 | 06/09/2023 | Quality Assurance | Aggregate | View |
2023-06-07-82 | 06/07/2023 | 06/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-06-47 | 06/06/2023 | 06/09/2023 | Quality Assurance | Aggregate | View |
2023-06-06-46 | 06/06/2023 | 06/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-05-41 | 06/05/2023 | 06/09/2023 | Quality Assurance | Aggregate | View |
2023-06-05-40 | 06/05/2023 | 06/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods