Summary for Test 2023-06-26-65-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215666 DEA: 11430564 EFIS: 1119000015 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-67-R6.0/24.4 |
| Award Date | 03/01/2022 |
| Closeout Date | 11/04/2024 |
| Work Description | COLD PLANE, RHMA OVERLAY AND HFST, AND INSTALL CHANNELIZERS. |
| Location Description | SAN DIEGO COUNTY NEAR LAKESIDE AND RAMONA FROM 0.2 MILE NORTH OF SAN DIEGO RIVER BRIDGE TO ROUTE 78 |
| QA Service Level | 1 (Verified on 07/06/2021) |
Sample Information
| Sample Taken Date | 06/26/2023 | Sample Unique Key | 65 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/26/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4" HMA-A |
| The quantity of what the sample constitutes | 12 boxes 3 bags | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Chris | Last name of sampler or witnessed by | Lawless |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 7209-JMF | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Martin Marietta Lakeside | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 23417005SR | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-06-26-65
DIME Test ID: 2023-06-26-65-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-07-21
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Melchor Oronoz
Date of test: 07/14/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 4006.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 5909.7 g
Mass of HMA Sample prior to ignition: 1903.0 g
Mass Loss: 99.6 g
Mass of aggregate remaining after ignition: 1803.4 g
Correction Factor (Percent by mass of HMA Specimen): 0.49 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 4.74 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/21/2023 ✔
