Project Details
This page displays current information for project DEA: 11430564.
Project Information
Project Identifiers | Project ID: 215666 DEA: 11430564 EFIS: 1119000015 |
---|---|
DIST-CO-RTE-PM | 11-SD-67-R6.0/24.4 |
Award Date | 03/01/2022 |
Closeout Date | 11/04/2024 |
Work Description | COLD PLANE, RHMA OVERLAY AND HFST, AND INSTALL CHANNELIZERS. |
Location Description | SAN DIEGO COUNTY NEAR LAKESIDE AND RAMONA FROM 0.2 MILE NORTH OF SAN DIEGO RIVER BRIDGE TO ROUTE 78 |
QA Service Level | 1 (Verified on 07/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
victor.h.mercado@dot.ca.gov | Victor Mercado | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-17-43 | 08/17/2023 | 08/18/2023 | Quality Control | High Friction Surface Treatment | View |
2023-07-27-52 | 07/27/2023 | 07/28/2023 | Quality Control | High Friction Surface Treatment | View |
2023-07-19-22 | 07/19/2023 | 07/20/2023 | Quality Control | High Friction Surface Treatment | View |
2023-06-26-68 | 06/26/2023 | 06/27/2023 | Quality Assurance | Aggregate | View |
2023-06-26-67 | 06/26/2023 | 06/27/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-26-66 | 06/26/2023 | 06/26/2023 | Quality Assurance | Aggregate | View |
2023-06-26-65 | 06/26/2023 | 06/26/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-15-41 | 06/15/2023 | 06/19/2023 | Quality Assurance | Aggregate | View |
2023-06-15-40 | 06/15/2023 | 06/19/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-14-46 | 06/14/2023 | 06/15/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods