Summary for Test 2023-06-24-1-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
| Award Date | 11/12/2020 |
| Closeout Date | 06/02/2025 |
| Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
| QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
| Sample Taken Date | 06/24/2023 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/24/2023 |
| Sample type | Quality Assurance | A brief description of the sample | Soil |
| The quantity of what the sample constitutes | 10960SQF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | larry | Last name of sampler or witnessed by | francisco |
| Title of sampler | TE | Telephone number of sampler | |
| Laboratory sample identification | 06242023TEST 01 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-06-24-1
DIME Test ID: 2023-06-24-1-1
Testing Lab: CT D08 - Blythe Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-06-26
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: larry francisco
Date of test: 06/24/2023
Gage No.: 33197
Test No.: 1
Nuclear By: larry francisco
Non-Bias Plan No.: 1
Depth: 8
Material No.: NATIVE
Material Type: SUBGRADE
Impact By: LARRY FRANCISCO
Standard Count Density: 1869 g/cc
Count or Density 1: 1868 g/cc
Count or Density 2: 1811 g/cc
Count or Density 3: 1721 g/cc
Count or Density 4: 1557 g/cc
Count or Density 5: 1603 g/cc
Standard Count Moisture: 688 g/cc
Moisture Count 1: 93 g/cc
Moisture Count 2: 85 g/cc
Moisture Count 3: 88 g/cc
Moisture Count 4: 94 g/cc
Moisture Count 5: 83 g/cc
Sum of Count or Density: 8560 g/cc
Average of Count or Density: 1712 g/cc
Sum of Moisture Count: 443 g/cc
Average of Moisture Count: 89 g/cc
Count Ratio Density: 0.92
Count Ratio Moisture: 0.13
Calculated Percent Relative Compaction: 96.2 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/26/2023 ✔
