Summary for Test 2023-04-03-16-3
Test performed: ASTM C1567-13Project Information
| Project Identifiers | Project ID: 8801 DEA: AML-CEM EFIS: AML-CEM |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for Cementitious Materials for use in Concrete Authorized Material List (AML) |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 04/03/2023 | Sample Unique Key | 16 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/03/2023 | Sample type | Annual Source Testing |
| A brief description of the sample | Class N Pozzolan | The quantity of what the sample constitutes | 1 Bucket |
| From where was the sample collected | Source | First name of sampler or witnessed by | N/A |
| Last name of sampler or witnessed by | NA | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | CM235302 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | DMI Global Pozzolan | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Cementitious | Brand | DMI |
|---|---|---|---|
| Mill | Global Pozzolan | Type of Cementitious Material | Class F or N Flyash |
Test Details
DIME Sample ID: 2023-04-03-16
DIME Test ID: 2023-04-03-16-3
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C1567-13: Standard Test Method for Determining the Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
Test Release Date: 2023-06-20
Test Results
Input Type: Measured
Tester's full name: Anthony Valdez
Date of test: 05/30/2023
Type and source of Portland cement: Nevada Fernley Type II
Alkali content of cement as percent potassium oxide: na
Alkali content of cement as percent sodium oxide: na
Alkali content of cement as percent calculated sodium oxide: .61
Comments about aggregate preparation: no data
Comments about specimen features: no data
Amount of mixing water: 207 ml
Initial reading of specimen 1: 0.1967 in
Initial reading of specimen 2: 0.1979 in
Initial reading of specimen 3: 0.1803 in
Zero reading of specimen 1: 0.1999 in
Zero reading of specimen 2: 0.2017 in
Zero reading of specimen 3: 0.1810 in
First subsequent reading of specimen 1: 0.0000 in
First subsequent reading of specimen 2: 0.0000 in
First subsequent reading of specimen 3: 0.0000 in
Second subsequent reading of specimen 1: 0.0000 in
Second subsequent reading of specimen 2: 0.0000 in
Second subsequent reading of specimen 3: 0.0000 in
Third subsequent reading of specimen 1: 0.1997 in
Third subsequent reading of specimen 2: 0.2012 in
Third subsequent reading of specimen 3: 0.1831 in
Percent change in length specimen 1 (zero reading): 0.0320 %
Percent change in length specimen 2 (zero reading): 0.0380 %
Percent change in length specimen 3 (zero reading): 0.0070 %
Percent change in length specimen 1 (first reading): -1.9990 %
Percent change in length specimen 2 (first reading): -2.0170 %
Percent change in length specimen 3 (first reading): -1.8100 %
Percent change in length specimen 1 (second reading): -1.9990 %
Percent change in length specimen 2 (second reading): -2.0170 %
Percent change in length specimen 3 (second reading): -1.8100 %
Percent change in length specimen 1 (third reading): -0.0020 %
Percent change in length specimen 2 (third reading): -0.0050 %
Percent change in length specimen 3 (third reading): 0.0210 %
Average percent change in length (zero reading): 0.0257 %
Average percent change in length (first reading): -1.9420 %
Average percent change in length (second reading): -1.9420 %
Average percent change in length (third reading): 0.0047 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/20/2023 ✔
