Summary for Test 2023-06-05-26-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 06/05/2023 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/05/2023 |
Sample type | Quality Assurance | A brief description of the sample | SOIL |
The quantity of what the sample constitutes | 7106SQF | From where was the sample collected | Job Site |
First name of sampler or witnessed by | tony | Last name of sampler or witnessed by | price |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | 06052023TEST 03 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-06-05-26
DIME Test ID: 2023-06-05-26-1
Testing Lab: CT D08 - Blythe Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-06-09
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: Yes
Input Type: Measured
Tester's full name: tony price
Date of test: 06/05/2023
Gage No.: 33197
Test No.: 3
Nuclear By: TONY PRICE
Non-Bias Plan No.: 2
Depth: 8
Material No.: NATIVE
Material Type: SUBGRADE
Impact By: TONY PRICE
Standard Count Density: 1829 g/cc
Count or Density 1: 951 g/cc
Count or Density 2: 927 g/cc
Count or Density 3: 956 g/cc
Standard Count Moisture: 583 g/cc
Moisture Count 1: 92 g/cc
Moisture Count 2: 83 g/cc
Moisture Count 3: 55 g/cc
Density: 2.14
Moisture: 0.1
Sum of Count or Density: 2834 g/cc
Average of Count or Density: 945 g/cc
Sum of Moisture Count: 230 g/cc
Average of Moisture Count: 77 g/cc
Count Ratio Density: 0.52
Count Ratio Moisture: 0.13
Calculated Percent Relative Compaction: 98.2 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/9/2023 ✔