Summary for Test 2023-05-18-9-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 994109
DEA: 060W1704
EFIS: 0617000103
DIST-CO-RTE-PM06-FRE-41-R27.4/R28.5
Award Date11/08/2022
Closeout DateNot set
Work DescriptionREMOVE AC PAVEMENT, WIDEN TRAVEL WAY, AND CONSTRUCT RETAINING WALL.
Location DescriptionFRESNO COUNTY IN FRESNO FROM 0.1 MILE SOUTH OF ASHLAN AVENUE OVERCROSSING TO SHAW AVENUE OVERCROSSING
QA Service Level1 (Verified on 07/13/2022)

Sample Information

Sample Taken Date05/18/2023 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/18/2023
Sample typeVerification A brief description of the sampleClass 2 Aggregate Base
The quantity of what the sample constitutes1000 SQYD From where was the sample collectedJob Site
First name of sampler or witnessed byallen Last name of sampler or witnessed byoliver
Title of sampler Telephone number of sampler5594175341
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAustin Aggs Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameDrainage system 5 A-B Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-20-0016
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedDrainage system 5 Lt 13.81
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-05-18-9
DIME Test ID: 2023-05-18-9-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-05-18

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Allen Oliver
Date of test: 05/18/2023
Gage No.: 30679
Test No.: 1
Nuclear By: Allen Oliver
Non-Bias Plan No.: 1 Even
Depth: 8
Material No.: no data
Material Type: Base Rock
Impact By: Allen Oliver
Standard Count Density: 1991 g/cc
Count or Density 1: 828 g/cc
Count or Density 2: 814 g/cc
Count or Density 3: 807 g/cc
Standard Count Moisture: 624 g/cc
Moisture Count 1: 123 g/cc
Moisture Count 2: 124 g/cc
Moisture Count 3: 122 g/cc
Sum of Count or Density: 2449 g/cc
Average of Count or Density: 816 g/cc
Sum of Moisture Count: 369 g/cc
Average of Moisture Count: 123 g/cc
Count Ratio Density: 0.41
Count Ratio Moisture: 0.2
Calculated Percent Relative Compaction: 98.3 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
IMG_0480JPG4441.43 KB05/18/20232023-05-18-9-1   Info

Test was verified on 5/18/2023