Summary for Test 2023-04-12-3-1
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Sample Information
| Sample Taken Date | 04/12/2023 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/12/2023 |
| Sample type | Quality Assurance | A brief description of the sample | Structure Backfill Geo Grad/SE |
| The quantity of what the sample constitutes | 1 bag of SBF Geo Aggregate | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Sal | Last name of sampler or witnessed by | Zepeda |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | SPM-Avenal | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-10-0006 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | From Stockpile, DS-22 | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1-1/2 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-04-12-3
DIME Test ID: 2023-04-12-3-1
Testing Lab: CT D05 - Whitley Gardens Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-04-12
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: Yes
Input Type: Measured
Tester's full name: Matthew Lang
Date of test: 04/12/2023
| Sieve Size | Cumulative Mass Retained | Cumulative Percent Passing | ||||
|---|---|---|---|---|---|---|
| 5298.4 grams | ||||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 85.0 grams | 98 % | |||||
| 237.4 grams | 96 % | |||||
| 603.8 grams | 89 % | |||||
| 925.8 grams | 83 % | |||||
| 1072.3 grams | 80 % | |||||
| 2701.7 grams | 49 % | |||||
| 515.8 grams | ||||||
| 165.7 grams | 33 % | |||||
| 232.2 grams | 27 % | |||||
| 279.8 grams | 22 % | |||||
| 307.6 grams | 20 % | |||||
| 333.6 grams | 17 % | |||||
| 389.4 grams | 12 % | |||||
| 436.8 grams | 8 % | |||||
General comments (publicly viewable) (Max 1000 characters): Failed on sieve #4
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 05-3307A4_37066_230412_KEE_SBfillGeo_GradSE_1 | 91.41 KB | 04/12/2023 | 2023-04-12-3-1 | Info |
Test was verified on 4/12/2023 ✔