Summary for Test 2023-02-16-28-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
| Award Date | 11/12/2020 |
| Closeout Date | 06/02/2025 |
| Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
| QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
| Sample Taken Date | 02/16/2023 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/16/2023 |
| Sample type | Quality Assurance | A brief description of the sample | Soil |
| The quantity of what the sample constitutes | 55SQF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Eduardo | Last name of sampler or witnessed by | gormez |
| Title of sampler | Caltrans Consultant | Telephone number of sampler | |
| Laboratory sample identification | 02162023TEST 01 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-02-16-28
DIME Test ID: 2023-02-16-28-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-02-22
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Eduardo gormez
Date of test: 02/16/2023
Gage No.: 67731
Test No.: 1
Nuclear By: eduardo gomez
Non-Bias Plan No.: 10
Depth: 8
Material No.: NATIVE
Material Type: STRUCTURALL BACKFILL
Impact By: eduardo Gomez
Standard Count Density: 1936 g/cc
Count or Density 1: 2407 g/cc
Count or Density 2: 1897 g/cc
Count or Density 3: 2292 g/cc
Standard Count Moisture: 613 g/cc
Moisture Count 1: 131 g/cc
Moisture Count 2: 174 g/cc
Moisture Count 3: 175 g/cc
Sum of Count or Density: 6596 g/cc
Average of Count or Density: 2199 g/cc
Sum of Moisture Count: 480 g/cc
Average of Moisture Count: 160 g/cc
Count Ratio Density: 1.14
Count Ratio Moisture: 0.26
Calculated Percent Relative Compaction: 91.6 %
Reported Percent Relative Compaction: 92 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/22/2023 ✔
