Summary for Test 2022-12-16-13-3
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 993116 DEA: 07320004 EFIS: 0716000029 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-R31.4/36.5 |
| Award Date | 09/08/2021 |
| Closeout Date | 11/01/2023 |
| Work Description | INSTALL WIRED MESH DRAPERY SYSTEM AND SLOPE AND ROADSIDE PAVING. |
| Location Description | LOS ANGELES COUNTY IN SANTA CLARITA FROM CANYON PARK BOULEVARD UNDERCROSSING TO SPRING CANYON ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
| Sample Taken Date | 12/16/2022 | Sample Unique Key | 13 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/20/2022 | Sample type | Department Acceptance |
| A brief description of the sample | PCC Aggregate | The quantity of what the sample constitutes | 3 Bags of Aggs |
| From where was the sample collected | Source | First name of sampler or witnessed by | Avo |
| Last name of sampler or witnessed by | Karajian | Title of sampler | TET |
| Telephone number of sampler | 213-798-6076 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Robertson's Ready Mix - Palmedale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0033 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-12-16-13
DIME Test ID: 2022-12-16-13-3
Testing Lab: CT D07 - Plant Services, Unit 1841
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-12-30
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Avo Karajian
Date of test: 12/20/2022
Temperature correction: 0
Temperature of solution: 75
Clay reading (test 1): 5
Sand reading (test 1): 3.8
Clay reading (test 2): 5
Sand reading (test 2): 3.8
Sand equivalent (test 1): 76
Sand equivalent (test 2): 76
Sand equivalent before temperature correction: 76
Sand equivalent after temperature correction: 76
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/30/2022 ✔