Project Details
This page displays current information for project DEA: 07320004.
Project Information
Project Identifiers | Project ID: 993116 DEA: 07320004 EFIS: 0716000029 |
---|---|
DIST-CO-RTE-PM | 07-LA-14-R31.4/36.5 |
Award Date | 09/08/2021 |
Closeout Date | 11/01/2023 |
Work Description | INSTALL WIRED MESH DRAPERY SYSTEM AND SLOPE AND ROADSIDE PAVING. |
Location Description | LOS ANGELES COUNTY IN SANTA CLARITA FROM CANYON PARK BOULEVARD UNDERCROSSING TO SPRING CANYON ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ali.mohsenzadeh@dot.ca.gov | Ali Mohsenzadeh | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 44 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-25-87 | 04/25/2023 | 05/02/2023 | Per Request | Asphalt Rubber Binder | View |
2023-04-25-86 | 04/25/2023 | 05/02/2023 | Per Request | Asphalt Binder | View |
2023-04-24-96 | 04/24/2023 | 05/02/2023 | Per Request | Asphalt Binder | View |
2023-04-25-62 | 04/25/2023 | 05/02/2023 | Verification | Crumb Rubber Modifier | View |
2023-04-25-61 | 04/25/2023 | 05/02/2023 | Verification | Crumb Rubber Modifier | View |
2023-04-25-60 | 04/25/2023 | 05/02/2023 | Verification | Aggregate | View |
2023-04-24-55 | 04/24/2023 | 05/02/2023 | Verification | Aggregate | View |
2022-12-16-13 | 12/16/2022 | 12/20/2022 | Department Acceptance | Aggregate | View |
2022-12-16-12 | 12/16/2022 | 12/20/2022 | Department Acceptance | Aggregate | View |
2022-12-16-11 | 12/16/2022 | 12/20/2022 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods