Summary for Test 2022-12-08-6-5

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 214993
DEA: 051F5004
EFIS: 0514000003
DIST-CO-RTE-PM05-SB-101,135-70.6/71.2;0.1
Award Date11/17/2020
Closeout Date01/11/2024
Work DescriptionCONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA.
Location DescriptionSANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION
QA Service Level1 (Verified on 09/03/2020)

Sample Information

Sample Taken Date12/08/2022 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/09/2022
Sample typeDepartment Acceptance A brief description of the sampleBridge Deck Concrete
The quantity of what the sample constitutes300 cu yds From where was the sample collectedJob Site
First name of sampler or witnessed byIsaac Last name of sampler or witnessed byGleffe
Title of samplerARET Telephone number of sampler18053191237
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalportland/Donaven Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number675RHS1260
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedNA
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampledbridge deck
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2022-12-08-6
DIME Test ID: 2022-12-08-6-5
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2022-12-08

Test Results


Input Type: Calculated
Tester's full name: Isaac Gleffe
Date of test: 12/08/2022
Temperature: 64 F
General comments (publicly viewable) (Max 1000 characters): Temp.

Test was verified on 12/8/2022