Summary for Test 2022-11-14-10-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Sample Information
| Sample Taken Date | 11/14/2022 | Sample Unique Key | 10 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/14/2022 |
| Sample type | Quality Assurance | A brief description of the sample | class 1 ASB |
| The quantity of what the sample constitutes | 1 bag Class 1 Subbase | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Brandon | Last name of sampler or witnessed by | Wood |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 37057CL1ASBGrad1 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | SPM-Avenal | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-10-0006 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1-1/2 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-11-14-10
DIME Test ID: 2022-11-14-10-2
Testing Lab: CT D05 - Whitley Gardens Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-11-14
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Kyle Engen
Date of test: 11/14/2022
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 13.3
Sand reading (test 1): 2.9
Sand equivalent (test 1): 22
Sand equivalent before temperature correction: 22
Sand equivalent after temperature correction: 22
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/14/2022 ✔
