Summary for Test 2022-08-24-62-1
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 213653 DEA: 044G8204 EFIS: 0413000049 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-10.6/10.8 |
Award Date | 05/05/2020 |
Closeout Date | 08/14/2023 |
Work Description | REPLACE SAN RAFAEL HARBOR BRIDGE (ABC) |
Location Description | MARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET |
QA Service Level | 1 (Verified on 05/31/2019) |
Sample Information
Sample Taken Date | 08/24/2022 | Sample Unique Key | 62 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/06/2022 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Pedro | Last name of sampler or witnessed by | De Haro |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Central | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 4EACCKS |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 192591 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Barrier wall | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-08-24-62
DIME Test ID: 2022-08-24-62-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2022-09-12
Test Results
Input Type: Calculated
Tester's full name: Pedro De Haro
Date of test: 09/06/2022
Temperature: 84 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/12/2022 ✔