Project Details
This page displays current information for project DEA: 044G8204.
Project Information
Project Identifiers | Project ID: 213653 DEA: 044G8204 EFIS: 0413000049 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-10.6/10.8 |
Award Date | 05/05/2020 |
Closeout Date | Not set |
Work Description | REPLACE SAN RAFAEL HARBOR BRIDGE (ABC) |
Location Description | MARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET |
QA Service Level | 1 (Verified on 05/31/2019) |
Samples
Samples submitted for this project.
Displaying 1-10 of 101 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-12-06-34 | 12/06/2021 | 12/16/2021 | Quality Assurance | Concrete | View |
2021-12-06-67 | 12/06/2021 | 12/06/2021 | Quality Control | Concrete | View |
2021-12-05-4 | 12/05/2021 | 12/05/2021 | Quality Control | Aggregate | View |
2021-12-05-5 | 12/05/2021 | 12/05/2021 | Quality Control | Aggregate | View |
2021-12-05-6 | 12/05/2021 | 12/05/2021 | Quality Control | Concrete | View |
2021-11-15-23 | 11/15/2021 | 11/16/2021 | Quality Control | Concrete | View |
2021-11-11-2 | 11/11/2021 | 11/12/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-11-11-3 | 11/11/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-11-11-4 | 11/11/2021 | 11/12/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-11-11-5 | 11/11/2021 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods