Summary for Test 2022-08-25-50-5
Test performed: ASTM C143-20Project Information
| Project Identifiers | Project ID: 215003 DEA: 040J6204 EFIS: 0414000019 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-680-12.4/21.9 |
| Award Date | 04/12/2022 |
| Closeout Date | Not set |
| Work Description | REHABILITATE PAVEMENT - RPL APP/DEP SLABS, 14 BRIDGES |
| Location Description | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN FROM KOOPMANN ROAD UNDERCROSSING TO ALAMEDA COUNTY LINE |
| QA Service Level | 1 (Verified on 10/19/2020) |
Sample Information
| Sample Taken Date | 08/25/2022 | Sample Unique Key | 50 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/25/2022 |
| Sample type | Quality Control | A brief description of the sample | 1 cubic ft. of Concrete taken from middle of batching |
| The quantity of what the sample constitutes | 1 cubic ft. of Concrete for Testing | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Mark Patrick | Last name of sampler or witnessed by | Baddu |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 85KV1-25F |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 996 - 1057 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Bed 4 - Truck 7 , Bed Delta - Truck 7 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-08-25-50
DIME Test ID: 2022-08-25-50-5
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2022-08-30
Test Results
Input Type: Calculated
Tester's full name: Abraham Luna
Date of test: 08/25/2022
Slump: 19 inch
General comments (publicly viewable) (Max 1000 characters): Flow: 19"
VSI: 0
Bed DELTA
Test was verified on 8/30/2022 ✔
