Summary for Test 2022-08-26-23-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
| Award Date | 06/06/2018 |
| Closeout Date | Not set |
| Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
| Location Description | LA/SBD County Line to PM 13.2 near I-15 |
| QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
| Sample Taken Date | 08/26/2022 | Sample Unique Key | 23 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/26/2022 | Sample type | Quality Assurance |
| A brief description of the sample | SOIL | The quantity of what the sample constitutes | 1958SQF |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | tony |
| Last name of sampler or witnessed by | price | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | 08262022 TEST 02 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | omar G G |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOB SITE | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-08-26-23
DIME Test ID: 2022-08-26-23-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-08-29
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: tony price
Date of test: 08/26/2022
Gage No.: 36636
Test No.: 2
Nuclear By: TONY PRICE
Non-Bias Plan No.: 7
Depth: 8
Material No.: IMPORT
Material Type: SUBGRADE
Impact By: TONY PRICE
Standard Count Density: 1823
Count or Density 1: 1002
Count or Density 2: 943
Count or Density 3: 901
Count or Density 4: 1035
Count or Density 5: 1023
Standard Count Moisture: 651
Moisture Count 1: 62
Moisture Count 2: 68
Moisture Count 3: 78
Moisture Count 4: 63
Moisture Count 5: 66
Sum of Count or Density: 4904
Average of Count or Density: 981
Sum of Moisture Count: 337
Average of Moisture Count: 67
Count Ratio Density: 0.54
Count Ratio Moisture: 0.1
Calculated Percent Relative Compaction: 96.5 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/29/2022 ✔
